未分類 UCSF Pride Hall Opening 1 8 月, 2023 In the summer of 2023, UCSF faculty on the ZSFG campus began moving their offices and labs over to UCSF PRIDE Hall! 深入瞭解
未分類 A Visit to the New Rehabilitation Center 3 7 月, 2023 Once located in a windowless basement, ZSFG’s Rehabilitation Center moved to a new, seismically safe home freshly built by ZSFG’s capital project team that is located on the third floor of Building 5. 深入瞭解